Work continues

Image
When I left there were a couple of outstanding jobs to be done and Marvin kept behind them reporting back to me and sending receipts.  The main task was the completion of the floor in the secondary school, being undertaken by Jose's father Pedro Antonio..  This was duly completed and after time to dry was put in use. There are however further tasks outstanding in this school, the  roof which really needs mending before the raining season and two further classrooms with very damaged floors. A joining path in Rafaela Herrera was also completed to remove a dangerous drop.  This took few materials and a little labour but made such a difference to the school. There seemed to be considerable difficulty getting things finished in Sintiope band Las Pilas.  However the head of Las Pilas was very ill, and it sounded like Coronovirus, although at that point the government was denying its existence in the country.  However the plumbing works at Sintiope were finally completed